top of page
Search

The Evolution of Training Environments: From Makeshift Walls to Modular Mastery

For decades, fire departments, law enforcement agencies, and military trainers have relied on ingenuity and grit to prepare their teams for real-world situations. Acquired structures—vacant homes, buildings slated for demolition, or donor properties—became makeshift training grounds. Wooden props and temporary partitions were the norm. But over time, the limitations of these solutions became increasingly clear: they were inflexible, costly, and often short-lived.

UNHINGED was born from the desire to solve that problem—and today, it’s reshaping how agencies train.


The Problem with Traditional Training Structures

Training is only as good as the environment in which it takes place. While acquired structures provide a semblance of realism, they come with a host of challenges:

  • Scarcity: Finding structures that are safe, legal, and available for training is becoming harder each year.

  • Predictability: Once a crew runs through a layout a few times, they begin to memorize it. Training becomes rote, and realism is lost.

  • Wear and Tear: Acquired structures degrade rapidly—especially when subject to repeated breachings, burns, and reconfigurations.

  • High Maintenance: Wooden training props must be built, painted, repaired, and replaced frequently. It’s an ongoing drain on time, budget, and personnel.

It became obvious to the UNHINGED team—veterans of both fire and law enforcement—that agencies needed something better.



Innovation Through Necessity: The Wooden Wall Phase

The first step in the UNHINGED journey wasn’t a high-tech breakthrough. It was a practical, boots-on-the-ground solution: build wooden walls inside acquired structures to change floorplans and extend their usefulness.

This simple approach worked wonders. By rearranging the layout, trainers kept participants on their toes and made every pass-through feel new. It added weeks, sometimes months, of value to a single building. Feedback from trainers and trainees alike was overwhelmingly positive.

But it wasn’t long before the limitations of wood reared their heads again. The weight. The splinters. The inevitable sag and rot from repeated outdoor use. The realization was clear: there had to be a better way.


Enter the UNHINGED Modular Training System

What started as a makeshift fix evolved into a full-fledged engineering effort. The UNHINGED team set out to design a modular training wall system that:

  • Could be reconfigured rapidly.

  • Was lightweight yet strong.

  • Could be used indoors or outdoors, in any weather.

  • Required no tools or extra hands to assemble.

  • Would outlast wood by years—without losing realism.

After countless rounds of design, prototyping, and field testing, the UNHINGED Modular Training System was launched.

ree

Materials Matter: From Foam Core to Field Tough

Each panel in the UNHINGED system is constructed with a closed-cell foam core encased in a fiber-reinforced ABS/pultrusion frame. This combo delivers incredible strength and durability while keeping each panel to just 60 pounds—nearly half the weight of comparable wooden setups.

The system resists impact, water, UV exposure, and extreme temperatures, making it ideal for both confined indoor facilities and remote field sites. And it doesn’t require painting, sealing, or replacing every few months.

This is not a compromise. It’s an upgrade in every direction.


Precision Engineering: The HLOX™ Advantage

At the heart of the system is UNHINGED’s patent-pending HLOX™ locking mechanism (U.S. Patent No. 63/773,138). This tool-free connection system allows a single person to lock panels together—securely and quickly—even on uneven ground.

From alley-dock parking drills to live-fire CQB, HLOX™ ensures that your structures stay solid under pressure while remaining easy to reconfigure between scenarios.

Training days don’t wait for construction crews. With UNHINGED, your environment adapts as fast as your mission changes.


ree

Modular Freedom: Train Smarter, Not Harder

The magic of modularity lies in its versatility. With the UNHINGED system, trainers can:

  • Create realistic layouts for everything from residential search-and-rescue to hostile room entries.

  • Add doors and windows that change from inward to outward opening in under a minute.

  • Practice V.E.S., breaching, confined space turnaround, and force-on-force scenarios—all with a single system.

  • Transform a parking lot or gymnasium into a high-stakes training maze in minutes.

No more adapting your drills to the space. Now the space adapts to your drills.


From Concept to Community

UNHINGED isn’t just a product—it’s a movement in training philosophy. It reflects a deep respect for those on the front lines and a recognition that training realism saves lives.

Fire departments, SWAT teams, and military instructors across the country are discovering what’s possible when their training grounds aren’t fixed—but flexible.


Ready for What’s Next?

From humble plywood walls to patent-pending engineering, UNHINGED represents the evolution of training environments. It’s built for those who demand more—more realism, more adaptability, and more durability.

If you’re ready to take your training to the next level, UNHINGED is ready for you.

 
 
 

Comments


bottom of page